Now this is a railway to make you think!

It’s a marshalling yard created by Xeon who is Chinese, so if some of the names look odd it’s because the appropriate Chinese font isn’t loaded.  The image above is taken from Xeon’s computer where the names display correctly.  However not having the correct font won’t affect operation of the railway.

The individual vehicles enter from the left and assemble into trains.  Care must be taken to ensure that each vehicle takes the appropriate track for its train – a lot of advanced planning is called for here!  Prior to departure the leading vehicle enters from the right and attaches to its train, which by then is fully assembled, and finally the train departs towards the right.

There are 18 trains in all to be correctly assembled and sent on their way, and there are 18 tracks so you will need to use them all.  Good luck – you are certainly going to need it!

Download it here

Pin It on Pinterest

Shares
Share This