A small map covering the Manchester Airport line from Slade Lane Jn to Wilmslow and a short section of mainline from Ardwick Jn to Heaton Norris Jn. It uses a working timetable from May 31, 2025 that runs from 06:00 to 12:00.
The mainline has about 8 trains per hour in each direction and the line to Manchester Airport also carries about 8 trains per hour. The section from Manchester Airport to Wilmslow carries 1-2 trains per hour.
(My first UK map!)
Download it here